Driveway

click to enlarge

Utility locate — click to enlarge

Construction plan

Electrical plan

Staked rise and run

  • new sensing loop in new driveway
  • new culvert at base of new driveway
  • electric outlet on post at sensing loop location (several buried UF cables)
  • move street number post to new location
  • regrade and revegetate old driveway
  • ribbons have been put on trees to preserve
  • remove old culvert
  • two irrigation lines down path of old driveway
  • two irrigation lines along new driveway
  • irrigation lines run to manifold at existing valve box
  • smurf tube under new driveway
  • new location for driveway light at base of driveway, new light fixture
water work for July 2019 – click to enlarge